he purpose of regulation is to save water, and thus energy, from the spring flood period for use during the next winter season. This maximises the production of energy during the winter when the demand is highest and the profit is the best. To be able to accommodate the spring flood the lowering of the reservoirs during the winter has to be adapted to the expected volume of the spring flood. Reservoir operators intend to keep the 90% level of the reservoirs over the summer to guarantee maximum possible energy production.



EUPORIAS has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under Grant Agreement 308291 - running from November 2012 to January 2017. Unless otherwise stated, the content of this page is licensed under